Condition

Foot

Luff

Producer

Sails

Sail area

Mainsail

 975,00

Sail Area: 24m2
Luff: 11.55m
Foot: 4.1m
Leech: 12m

 745,00

Sail Area: 29.5m2
Luff: 12.5m
Foot: 4.7m

 1.000,00

Sail Area: 30m2
Luff: 13.7m
Foot: 4.4m

 500,00

Sail Area: 29m2
Luff: 12m
Foot: 4.6m

 1.000,00

Sail Area: 21m2
Luff: 10.7m
Foot: 3.8m

 690,00

Sail Area: 9m2
Luff: 5.85m
Foot: 2.35m
Leech: 6.2m

Original price was: € 1.600,00.Current price is: € 650,00.

Sail Area: 17.32m2
Luff: 7.94m
Foot: 2.87m
Leech: 8.33m

 1.500,00

Original price was: € 1.900,00.Current price is: € 750,00.

Luff: 2.6m
Foot: 3.4m
Leech: 6.19m

Original price was: € 3.750,00.Current price is: € 2.250,00.

Sail Area: 43.2m2
Luff: 14.2m
Foot: 5.35m
Leech: 15m

Original price was: € 2.675,00.Current price is: € 750,00.

Sail Area: 21.1m2
Luff: 12m
Foot: 2.87m
Leech: 12.25m

 200,00

Sail Area: 11.5m2
Luff: 8.6m
Foot: 2.25m
Leech: 8.55m

Definition and key measurements

The mainsail fills the main triangle bounded by mast, boom and tack. Standard dimensions:

P = luff length (mast track from boom to black band)

E = foot length (boom from mast to black band)

Roach = extra curve beyond the straight line from head to clew

Area = (P × E) / 2 + roach allowance

Girths (MGUM, MGM, MGU) control shape when reefed.

Mainsail categories

Full-batten mainsail

Horizontal battens span clew to luff

Zero flutter, maximum projected area

Requires lazy-jacks or Dutchman for flake control

Ideal for performance cruisers and racers

Typical roach 12–18 %, supported by 5–7 full battens

Partial-batten mainsail

3–4 short battens at upper leech only

Easier to hoist and flake by hand

Moderate roach (8–10 %)

Standard on boats under 30 ft or charter fleets

In-mast furling mainsail

Vertical battens or none; zero roach

Rolls inside mast via continuous-line furler

Infinite reef points, single-line cockpit control

Trade-off: 15–20 % less drive than battened mainsail

Cloth: vertical-cut Dacron or hydra-net for roll stability

Storm trysail

Separate sail, bright orange, 15–25 % of working mainsail area

Set on dedicated trysail track parallel to mast

Deep third reef replaces trysail on modern rigs

Required for World Sailing OSR Category 0/1

Procurement and upcycling

Send P/E measurements to info@resail.org for a matched second-hand mainsail or to arrange free collection of your retired sail. Every exchange keeps 20 m² of technical textile in circulation.